CORKSCREW - NARP CORKSCREW - NARP
English EN German DE Russian RU Turkish TR

CORKSCREW

CORKSCREW

by
← All references
Ship type
Bulk carriers › Bulk carrier
IMO
9496161
Project years
2020
Projects
1

Scope of work

Main engine

  • Main engine full overhaul and spare supply
  • Crankshaft deflections
  • M/E crankpin bearing inspection
  • M/E main bearing inspection
  • M/E crosshead bearing inspection of upper cap and lower cap
  • M/E thrust bearing inspection of upper cap and lower cap
  • M/E air cooler overhaul
  • M/E fuel pumps overhaul
  • M/E fuel pump roller guides inspection
  • Main engine starting air valve overhaul

Auxiliary machinery

  • Steering gear vane pump inspection and overhaul

Deck machinery & cranes

  • Sheave replacement
  • Crane boom parking slot cushion
  • Cranes cabin mounting bolts renewal
  • Crane brake lining
  • Cargo crane inspection
  • Cargo lifting block overhaul
  • Crane load tests
  • Windlass brake lining replacement
  • Hatch covers channel repairs
  • Renewal of hatch cover channels rubber packings & fittings
  • Hatch cover – vent cover repairs
  • Hatch covers hydraulic cylinders overhaul
  • Hatch covers leak test by ultrasonic & coaming rest pads adjustment

Hull, steel & painting

  • Name plate fabrication
  • Fire door and all manholes gasket replacement
  • Renewal of corroded parts

Electrical

  • Air circuit breakers cleaning, maintenance and performing tests
  • Overhauling of electric motors

Cargo & tank systems

  • Ballast & fuel tanks air ventilation repair
  • Ventilation mushrooms repair